Key Takeaways
- Secure AOAO approval before depositing on equipment—each building has unique rules.
- Plan line-set routes early to avoid structural drilling or visible chase covers.
- Choose ultra-quiet indoor heads and vibration pads to pass Honolulu noise limits.
Step 1: Review AOAO HVAC Policies
- Request the building’s HVAC guidelines and architectural application.
- Confirm approved condenser locations (lanai, roof deck, mechanical rooms).
- Note hours for drilling, elevator reservations, and noise testing requirements.
Step 2: Select the Right Equipment
- Use low-static, ultra-quiet indoor heads for shared walls; aim for ≤ 22 dB.
- Coastal-rated condensers with epoxy coating extend life above Waikiki’s salt air.
- Choose dripless condensate pumps for high-rise installs; gravity drains rarely meet code.
Step 3: Map Line-Set and Electrical Paths
- Coordinate with building engineer to access chase spaces or risers.
- For exposed runs, choose paintable line-hide to match exterior finishes.
- Add dedicated 240V circuits with lockable disconnects per building code.
Step 4: Schedule Install Day Logistics
- Reserve service elevator and parking for technicians and freight deliveries.
- Protect common areas with floor covering and ensure security access badges are ready.
- Provide neighbors advanced notice to reduce complaints during compressor testing.
Step 5: Post-Install Compliance
- Submit final inspection photos, permit cards, and sound test results to AOAO.
- Program thermostats with humidity control to prevent lanai condensation.
- Enroll in quarterly maintenance; many AOAO agreements require proof of service.